New asphalt can be driven on once the “cessation temperature” (point at which the binder has cooled and stiffened to the point that it can no longer be compacted) of around 150 degrees Fahrenheit or below has been reached. Generally by the time the crew has left the jobsite, the asphalt has cooled to the point that no damage can be done by routine traffic.